CIP Survey Request Form 

If you think that you may have a CIP requirement then please fill out this form and we will contact you to arrange a survey. Suncombe pioneered CIP nearly 50 years ago and have a wealth of experience of CIP of all different types. Please fill in this form or simply send an e-mail to sales@suncombe.co.uk with brief details of your requirements:

Please provide the following information:

Name

Title

Organization

Work Phone

E-mail Address (PLEASE COMPLETE THIS FIELD)

Survey Questions:

Would you Like a CIP Survey of your existing Plant?

 

Have you any preferred dates for a visit?

If possible fill in as much information as you can in the form below and a Suncombe engineer will contact you to arrange a visit

Product Questions:

State the type of product/s being produced

State the type of soil to be removed (baked on, protein, water soluble)

What is your current cleaning method?

What is the cleaning result required? (visually, microbiologically)?

Equipment Questions:

What is to be cleaned? (Pipework, vessels, equipment etc.)

How often is it to be cleaned?

How long can the cleaning take?

Do you have a preference for suppliers for valves, pumps, sprayballs etc.

System Questions:

Do you want a mobile or static system?

Do you have a preferred CIP philosophy? (total loss/partial recovery/total recovery).

Do you know how many tanks that you want?

Can the solutions be recirculated?

Do you want the solution heated?

If so, what temperature is required for cleaning?

If so, do you have steam/hot water available for heating?

Is the system to be aqueous or solvent?

Where is the equipment to be sited? What is the headroom and any ingress limitations

How will the CIP liquid reach the equipment and return? (valve manifold, Flowplates, hoses etc.)

Do you have any preferred chemicals?

State the drain capacity and are there any limitations (temperature, chemicals)?

Level of automation? (manual, semi-automatic, automatic, DCS )

If automatic state type and preferred supplier ( PLC /SCADA/Siemens/Allen Bradley)

Is it necessary to comply with any special regulations? - if so, please specify:

Do you need installation, modifications etc. Please describe.

What is the Zone classification of the area (safe, ATEX dg etc.):